Now we discuss the pros and cons of sending a flashed manifold out for repair versus performing this task in-house. This article will begin to deal with the disassembly, troubleshooting, cleaning and reassembling of a typical, and flashed 16-cavity valve gate manifold.
Obviously there are many different makes of hot runner manifolds currently being used in the making of plastic parts today. Relevant (and most critical) design differences that will affect a manifold’s potential to leak concerns how the nozzles, sprue and any cross-overs (or bridges) are connected to the manifolds. These components are either bolted to, threaded into or rely on a compression stack, and sometimes a combination of all three. Each type has its trade-offs concerning required maintenance of the system and the overall ease of installing replacement parts, such as thermocouples, nozzles, nozzle tips and heaters.
Regardless of flowery forecasts made by manifold sales folks, the ease at which a manifold system can be maintained will not be apparent until the system has some hours on it (a million cycles would be nice), giving internal components, pockets and tooling clearances time to collect vent residue (greasy film or powders) and weepage (gooey, degraded plastic).
Also impacting manifold condition are molds stressed through weekend shut-downs and hurried Monday morning start-ups along with touchy gate/valve pin tip configurations that promote out-of-spec gate vestiges—forcing processors to fiddle with the parameters.
Some systems require a complete teardown just to replace a nozzle heater or thermocouple. On others, if specific components are disturbed or removed they too must be completely disassembled and cleaned before reassembly to ensure proper component stack dimensions.
The level of disassembly/reassembly (labor hours and skill level) required over time to replace basic components along with the usage (cost) of the components will determine the true ease of maintenance with the system.
But obviously, any manifold that encapsulates easily (easily meaning that if a strict start-up procedure is not followed to the letter, the system has the capability to blow at multiple locations) will not be a popular choice among those of us who have to fix or run them.
For the sake of fairness and consistency, we will examine areas of concern regardless of the manifold make and model.
In manifold maintenance, the same five basic principles that apply to a mold also apply to an encapsulated manifold. The only difference is that troubleshooting the source of the leak could be ongoing throughout the repair process as plastic is removed and more tooling is exposed—allowing better visual inspection of seal areas and components, right up through assembly of the cleaned components.
Here is an overview of the five basic steps that will occur on an encapsulated system:
1. Disassemble
Remove the valve pins and clamp plate, and disassemble mold to gain visual access to the back of manifold.
Pay attention to tooling clues that can point to the leak source (bent, broken or galled valve pins and the amount and type of residue around the pin).
Remove enough plastic as to facilitate separating the manifold and electrical box from the plate, so that you can clean these components separately.
2. Clean
Clean clamp plate, manifold plate channels, counter-bores and valve pins (ultrasonic).
Clean nozzles, heater and thermocouple wires and manifold (by hand).
3. Troubleshoot
Inspect seal areas of components for obvious cracks and plates for hobbing and bolts for looseness.
4. Assemble
Reassemble to stage one.
Electrical check.
Final reassembly to stage two.
5. Final Check
Electrical check ramping heaters up to processing temp with water flowing through appropriate channels.
Let’s begin with the mold in the press. The first noticeable sign of a flashed manifold is usually when smoke is seen rising from the top of the stationary side, or plastic oozing from places it shouldn’t … then the panic and finger pointing ensues.
But there are other, more subtle clues that might point to a manifold leak, such as molds that produce periodic incomplete shots, shorted out heaters and thermocouples in a particular quadrant.
Paying attention to these signs can alert a processor to a possible manifold malfunction and allow them to shut a mold down before the manifold is totally encapsulated.
Hot runner systems have hit their stride as the desire to reduce scrap and improve efficiency and productivity has caused mold buyers to shell out the added dollars for the technology. Husky Injection Molding Systems is one of the largest manufacturers of hot runners and temperature controls in the world, so it has a vested interest in seeing that its customers receive the benefits of these systems over the long term. To help with that, the company offers its hot runner maintenance and refurbishment program.
There are many processes available to assist you with thorough cleaning of a manifold. Depending on the complexity of your manifold it is often impossible to properly clean the channels inside a manifold simply by removing plugs and removing the plastic.
When hot-runner systems leak, experience and skilled technique should never be compromised for the delusion of a quick turnaround. The only thing that draws white shirts into the toolroom faster than a leaking manifold is one that leaks immediately after a rebuild
The attraction of cleaning a flash-encapsulated system in-house rather than sending it out is the expectation of faster turnaround and lower cost. An experienced technician can chip, clean, partially rewire, and reassemble a 16-cavity valve-gate manifold of average complexity (such as a cap mold) that is completely flashed in about 30 hr, providing he/she has a heat gun, ultrasonic cleaning tank, appropriate music, and lots of coffee.
Multiply these hours by your fringe labor costs and possibly add in a couple of replacement heaters or thermocouples and you can easily invest $1500 to $2000 in the job. But the big advantage is that if you have experienced techs available around the clock, then you only lose about a day and a half of production. That is roughly the time it takes to crate and ship the mold to an outside vendor and is the number-one reason why many cleanings are first attempted in-house.
Repairing and maintaining a typical hot runner system takes mold maintenance skills to the next level.
While all mold repair work should be performed methodically and carefully, successful hot runner repair requires a higher level of precision, understanding and accuracy that can only be accomplished in a systemized approach that utilizes accurate documentation of the critical elements of manifold work.
Tooling in a typical hot runner system must be handled with great care while cleaning, inspecting and reassembling.
Methodical practices must be used to prevent potential disasters that could be just a wrench slip, pinched wire or forgotten bolt away.
Adding to the challenge is various processing techniques and resins that can have a huge effect on the performance, condition and maintenance practices concerning a hot runner system.
common issues about maintaining hot runner system will be discussed and useful bench techniques will be taught that include:
Performance and maintenance characteristics of several popular brands of hot runner systems used today.
Working safely on hot manifolds.
Disassembly, cleaning and assembly techniques used at the bench.
Typical problems created through bad work habits—when to utilize extreme care.
Wiring how-to, splices, repairs, resistance checking, heater size verification, and replacement.
Some experience about cleaning out hot runners:
1) To clean out the runners, let tool cool and dismantle.
2) Remove end plug grub screws, (Note it may be necessary to heat manifold to loosen screws if they are stuck).
3) Before you can extract the end plugs you must remove the M4 grub screws which lock the end plugs in place. This is normally located on the top of the manifold, but may be at the bottom of the heater groove, in which case you will need to remove the heater as well. You will need to use a puller to extract the end plugs.
4)Then heat the manifold to the BOTTOM range of its processing temperature and using a hot wire with a hook on the end, try to hook out the melt just as the outer layer of plastic melts in the runner.Do not under any circumstances attempt to blow out hot plastic with an air gun.take extreme care not to scratch bores.
5)If this is not successful, heat the manifold to full operating temperature and allow to so ask for 20-30 minutes and use a tight fitting rod of soft material e.g. Aluminum to push out the plastic from the runners.
6)If the manifold has deviation plugs, contact supplier before attempting dismantle.
7)Carefully refit end plugs, making sure alignment of end radii is correct, apply anti seize to threads on set screws.
8)Torque to figures in manifold catalogue.
9)Refit manifold.
Cleaning of hot runner systems using unfilled purging compound grades may now be performed. purging compound that is run through hot runner channels combines with residual materials and removes them safely while leaving a minimal amount of residue.
if any one has any question about this issue,Please leave a message here. I am a super visitor to this website and I will answer your questions
I agree you at all,But this is not absolute experience, as long as your engineers have enough experience
it seems that cleaning a set of hot runner system is a very professional job, you need professional training before doing
do you want to clean a set of hot runner system? i don’t think this is a good idea, but the experience you shared in this blog is very good.