Now we discuss the pros and cons of sending a flashed manifold out for repair versus performing this task in-house. This article will begin to deal with the disassembly, troubleshooting, cleaning and reassembling of a typical, and flashed 16-cavity valve gate manifold.
Obviously there are many different makes of hot runner manifolds currently being used in the making of plastic parts today. Relevant (and most critical) design differences that will affect a manifold’s potential to leak concerns how the nozzles, sprue and any cross-overs (or bridges) are connected to the manifolds. These components are either bolted to, threaded into or rely on a compression stack, and sometimes a combination of all three. Each type has its trade-offs concerning required maintenance of the system and the overall ease of installing replacement parts, such as thermocouples, nozzles, nozzle tips and heaters.
Regardless of flowery forecasts made by manifold sales folks, the ease at which a manifold system can be maintained will not be apparent until the system has some hours on it (a million cycles would be nice), giving internal components, pockets and tooling clearances time to collect vent residue (greasy film or powders) and weepage (gooey, degraded plastic).
Also impacting manifold condition are molds stressed through weekend shut-downs and hurried Monday morning start-ups along with touchy gate/valve pin tip configurations that promote out-of-spec gate vestiges—forcing processors to fiddle with the parameters.
Some systems require a complete teardown just to replace a nozzle heater or thermocouple. On others, if specific components are disturbed or removed they too must be completely disassembled and cleaned before reassembly to ensure proper component stack dimensions.
The level of disassembly/reassembly (labor hours and skill level) required over time to replace basic components along with the usage (cost) of the components will determine the true ease of maintenance with the system.
But obviously, any manifold that encapsulates easily (easily meaning that if a strict start-up procedure is not followed to the letter, the system has the capability to blow at multiple locations) will not be a popular choice among those of us who have to fix or run them.
For the sake of fairness and consistency, we will examine areas of concern regardless of the manifold make and model.
In manifold maintenance, the same five basic principles that apply to a mold also apply to an encapsulated manifold. The only difference is that troubleshooting the source of the leak could be ongoing throughout the repair process as plastic is removed and more tooling is exposed—allowing better visual inspection of seal areas and components, right up through assembly of the cleaned components.
Here is an overview of the five basic steps that will occur on an encapsulated system:
1. Disassemble
Remove the valve pins and clamp plate, and disassemble mold to gain visual access to the back of manifold.
Pay attention to tooling clues that can point to the leak source (bent, broken or galled valve pins and the amount and type of residue around the pin).
Remove enough plastic as to facilitate separating the manifold and electrical box from the plate, so that you can clean these components separately.
2. Clean
Clean clamp plate, manifold plate channels, counter-bores and valve pins (ultrasonic).
Clean nozzles, heater and thermocouple wires and manifold (by hand).
3. Troubleshoot
Inspect seal areas of components for obvious cracks and plates for hobbing and bolts for looseness.
4. Assemble
Reassemble to stage one.
Electrical check.
Final reassembly to stage two.
5. Final Check
Electrical check ramping heaters up to processing temp with water flowing through appropriate channels.
Let’s begin with the mold in the press. The first noticeable sign of a flashed manifold is usually when smoke is seen rising from the top of the stationary side, or plastic oozing from places it shouldn’t … then the panic and finger pointing ensues.
But there are other, more subtle clues that might point to a manifold leak, such as molds that produce periodic incomplete shots, shorted out heaters and thermocouples in a particular quadrant.
Paying attention to these signs can alert a processor to a possible manifold malfunction and allow them to shut a mold down before the manifold is totally encapsulated.
Disadvantages of Hot Runner System
While the hot runner system offers a wide range of significant advantages over the cold runner systems, users of molds also need to understand the disadvantages of hot runner systems. It will help users to decide effectively before choosing the right runner system for their projects. To sum up, the disadvantages of hot runner systems include:
The complexity of operation & Maintenance / High requirement for equipment / Increased cost / Thermal contraction and expansion / Degradation of heat-sensitive resin
1 The complexity of operation & maintenance
The hot runner mode of operation and maintenance is complicated. As a result of its complexity, it may easily damage the hot runner part if proper precaution is not taken. This may lead to a big economic loss for the company. Likewise, for new hot runner users, it may take a while to gain the experience for proper maintenance and operation.
2 High requirement for equipment
The requirements for the use of hot runner is on the high side. The hot runner mold requires precision processing machinery in both cooperation and integration. If the requirements are not supplied at its best, the components may develop serious problems during production. For example, whenever the plastic seal is faulty, then the plastic melt overflows and damages the hot runner components. Another example – when the nozzle and the gate are not properly placed, it will affect the product quality negatively.
3 Increased cost
In terms of cost, hot runner components are expensive. This in turn leads to a significant increase in the general cost of purchasing the hot runner mold. Also, if your company has a low production rate, then the use of the hot runner may be unnecessary or not economical. In developing countries, the use of hot runner systems is widely affected due to its expensive nature.
4 Thermal contraction and expansion
There are different hot runner systems out there with various designs. For some of these hot runners, they exhibit thermal contraction and expansion. This is attributed to the constant heat produced during processing. Also, heat radiation produced during the period of production may be difficult to control.
5 Degradation of heat-sensitive resin
The use of a hot runner system for heat-sensitive resins may require extra care and great expertise. If proper care is not taken, users may have to deal with degradation. The degradation may be in the form of sight color change or as complex as the cross-linking of the molecular chain.
Repair technicians must be properly trained in hot runner characteristics so that companies are not experiencing unnecessarily long and expensive downtime hours while waiting to get a mold return from an outside vendor. repairing and maintaining a typical hot runner system takes maintenance skills to the next level. successful hot runner repair requires a higher level of understanding, concerning how they function and their critical areas that need to be monitored. safe, precise, and reliable repairs can only be accomplished in a methodical approach that utilizes accurate documentation and a thorough knowledge base that guides technicians through specific procedures during maintenance and repair work. tooling in a typical hot runner system must be handled with great care while cleaning inspecting and reassembling. specific practices and techniques must be used to prevent potential flooding or encapsulation disasters that can plague all hot runner systems. also discussed are various processing techniques and resins that can have a huge effect on the performance, condition, and maintenance practices of a hot runner system. the cleaning procedure of manifold cleaning, refurbishment, electrical on hot runner systems is crucial.
There are two choices for cleaning up the system: the first choice is to send it to a qualified service center where the system will be placed in an oven at high temperatures to burn off the excess plastic. the advantage of this method is a fast turnaround with new thermocouples and heaters. the disadvantage is cost. new thermocouples and heaters are expensive. time is also a factor, it may take about a week to have the mold returned or longer if 48 heaters cannot be quickly found. the second choice is to clean it in-house. this option can save thousands of dollars, including a 50% to 75% savings just in thermocouples and heaters. a determination also can be made from where the leak came from. knowledge can be gained on how to prevent future leaks and the overall operation of the system. house repairs properly executed will always save time and money. there are disadvantages to an in-house repair it can take 40 man-hours or more to completely clean and rewire the system on a typical 48 cavity mold, even longer if you don’t have the proper equipment. cleaning and repairing an encapsulated system also requires a higher skill level to troubleshoot, clean, and reassemble without further damage. failing to do this correctly can cause the system to flood again. due to an unrelated issue that caused the first flooding. many hot runner manifold problems can be traced back to a lack of knowledge concerning hot runner assembly mistakes, poor work habits, improper tools use during the clean and repair of the manifold, and critical components.
Here are some methods and tools that will make it possible to separate the wires properly and safely and allowing the heaters and thermocouples to be removed. this must be done first to remove the nozzles from the plate for cleaning and inspection. For example, a 48 cavity valve gate system that was completely flooded from the front or nozzle tip side of the hot half of the mold. it appears that there is a major leak between the nozzle seal and the cavity block, allowing the plastic to flow into the wire channels, then back into the manifold. unfortunately, this completely encased the wires in plastic, or in this case polypropylene. several different colors could be seen, so the leak was not detected immediately. since the mold is going to need a complete teardown, the electric control box, manifolds, bridge have been removed. all wires have been numbered and disconnected so they can be thread through the wire channels in the plate one at a time. on this mold, the thermocouple wires run along the entire length of the nozzle, making removal from the front impossible. this will necessitate removing the nozzle from the back just to get to the thermocouple. on better design systems, thermocouples are easily removed from the front of the mold instead of requiring a complete manifold removal just to change out a defective one. make sure the necessary safety equipment is present. this includes a full face mask, heat-resistant gloves, and a shop coat.
a vacuum system to draw off as much of the smoke as possible as desirable as is plenty of light, tilting the mold back at about a 20-degree angle is helpful to get it into a more comfortable working position, resulting in better control of melting and separating the wires. the objective is to see exactly where the wires are routed through the channel and to which heater, so the wrong wire will not be pulled, which could break it. even though the control box has been disconnected and removed, the heaters can still be warmed up to remove the plastic that surrounds them. using a special tool and a direct connection to a 110-volt plug. the individual band heaters can be heated to remove the plastic that surroun
The Hot Runner is a system for molding which saving the materials usage, the materials runner extensive a longer way getting closer to the mold cavity. The system working without wasting plastic. It saved a lot especially for some expensive materials. It is popular although the cost is higher than current mold design during large q’ty production.
The hot runner system is divided into a fully hot runner and a semi hot runner. Fully runner design is complex, but the effect is good and maintenance costs are very low. Semi-hot runner structure is simple, stable and easy to use, low failure rate, because the structure is simple ,therefore low maintenance costs, the stability of the production have a greater guarantee. Hot runner classification: open (for semi-hot runner), needle valve type (for fully runner).