According to the TIR made by testing workers and the TVR by quality inspection department, the MPI (Manufacture Processing Instruction) can thereby be formulated, wherein the following aspects are included:

1 Mold No. and Testing No.
2 Description of Problem Points.
3 Dash No. (including Cavity No.).
4 Countermeasures for Mold Repair.
5 Mold Repair Department.
6 Corresponding Dimension and Current Status of TVR.
The factory shall arrange for the repair of mold according to the description of problem points listed

in MPI as well as corresponding solutions, wherein the arrangement for new mechanical processing and bench work procedures such as polishing may be involved. Moreover, if one of the parts is discarded, new materials shall be prepared for re-processing to replace the discarded part, which is referred to as re-processing operation. Upon the completion of processing for parts and components, the bench worker shall re-assemble them and prepare for re-testing.