a manufacturing plant that produced gasoline fuel dispensing systems—during which we toured the plant floor with a small group of engineers and managers. we stopped in front of a punch press, asked everyone to look at the operation and determine the percentage of value adding time (time when materials are being converted, altered by either machines or labor).
we then took out we stopwatch to time the operation. Two workers in front of the punch press proceeded to bend down and pick up a large sheet of thin stainless steel from the left side of the press. They placed the steel into the bed of the press. Then they removed their hands to press buttons outside the press, which indicated that their hands were out and clear of the press. The large press came down and formed the metal into a side of a gasoline pump. Then the two workers reached into the press, removed the formed sheet and placed the formed sheet at the right side of the press.
What was the value adding percentage?One engineer said, “100 percent, the workers never stopped working.” Another engineer said, “75 percent,” and another said, “50 percent.” we looked at our stopwatch and said, “Only 12 percent of the time was the process adding value.
Adding value is only when the dies are pressing against the metal to create the formed sheet, the rest of the time is waste.” Waste is defined as that which does not add value to the product—excess inventory, excessive motion, transportation, defects (producing scrap), waiting time (workers watching machines), overproduction, incorrect processing and the underutilization of people’s creative talents.
Then we asked, “What can you do to improve the value adding time?” An engineer immediately said, “You can place a table over here and put the raw inventory sheets on top of the table, so they wouldn’t need to bend down; they could just slide the sheets directly into the press.” Another engineer said, ”
We could install a leveler to automatically raise the sheet metal to keep it at a constant height.” A third engineer said, “We could put a spring into the back of the punch press to force the formed metal to leap forward after the stamping.” “Yes,” we said. “You all know what to do, so do it!”
This demonstrated the importance of stimulating others to think about how they could bring change to the production process without spending a lot of money.
Another punch press operation was observed. Now, we asked, “How long does it take you to make this changeover when you go from one product to another?” “Around two hours,” was the answer. “we want you to do it in less then 10 minutes,” said we. There was a lot of grumbling—especially from a worker who had been working on the press for the past four years and it always took him around two hours to do the changeover.
we proceeded to explain the process, “First, we want you to make a shim; cut out a piece of metal and attach it to the top of the next die that you are going to use. This shim will make each die the exact same height so that when you do the changeover, you will not have to adjust the cam.
You can then just pull out the old die and slide the new one in without any height adjustment. Second, when the previous process is complete and you are ready to do the next changeover, blow a loud whistle to attract the changeover team, time it with a stopwatch, chart the results, and post those results near the punch press machine. Third, put a metal block under the inventory so the sheet metal slides in quickly. If the thickness of the metal changes you can easily put in another metal block to meet that thickness.”
we discussed the value of examining each part of the changeover process to reduce the time it takes.
He explained external activities (outside exchange of die)—things you can do while the machine is running—including making sure all of the tools and inventory needed are ready and close by; checking to see that the next die is ready with all of the necessary parts; pre-heat the die if necessary, etc.; and internal activities (inside exchange of die)—things that can only be done when the press stops—including the use of cranes to lift the die or pneumatics to move the die around; change the clamping method to reduce the number of bolts and hoses, etc. we then requested to see the new changeover process. It was completed in 12 minutes.
Good day! I just want to give you a huge thumbs up for your
excellent info you have got right here on this post. I’ll be returning to your web site for more soon.
thanks for your comment! your encouragement is very important for us, we will keep it up!
Pretty great post. I simply stumbled upon your blog and wanted to mention that I’ve
truly enjoyed browsing your weblog posts. After all I’ll
be subscribing on your rss feed and I am
hoping you write once more very soon!
your encouragement is very important for us! as for web host.I think the local professional website company in your side can help you, if you still have question, please feel free contact us!
Nice blog here! Also your website loads up very fast!
What web host are you using? Can I get your affiliate link to your host?
I wish my web site loaded up as quickly as yours lol
welcome to visit our website! please enjoy it!
It’s perfect time to make some plans for the future and it is
time to be happy. I’ve read this post and if I could I want to
suggest you few interesting things or advice.
Maybe you could write next articles referring to this article.
I want to read more things about it!
Hi we are waiting for your great ideal?
It’s going to be end of mine day, except before ending I am
reading this wonderful post to improve my know-how.
thanks for your comment? we will consider it carefully
Hi, Neat post. There is a problem along with your site in web explorer, may test this?
IE still is the market leader and a good element of other people will omit your wonderful writing because of this problem.