In most welding shops, there is a certain procedure for handling a mold from when it arrives for repair to when it is ready for a customer. At my company, it is a seven-step process that may require adjustments depending on whether we are using micro-TIG or laser welding. For example, preheating and postheating are often essential parts of micro-TIG welding, but not laser welding. Regardless of the process used, the following steps can help any shop secure an effective mold repair procedure.
Step 1: Diagnosis. Welders should ask a series of questions regarding the location of the weld, material type and the goal of the task in order to accurately diagnose the repair and devise the best welding solution. Communication between the welder and the engineer is critical. Any potential problems that might inhibit the welding process must be discussed. These problems include, for example, EDM recast layers, steel types, contamination, coatings and ease of access. In addition, the specific welding process to be used must be determined and discussed in terms of its advantages and disadvantages.
Step 2: Cleaning. Thoroughly clean all potential welding repair areas before welding begins to prevent contamination from causing porosity and microscopic cracks in the mold surface. Remove oil and grease with isopropyl alcohol, acetone or another special cleaning solution appropriate for use on molds. Dig out rust or pitting with a stainless steel brush. Its hard bristles can remove most contaminants. Do not use a stainless steel brush to clean a diamond-polished surface, however, as it will cause scratches. Also, if you are unable to completely remove contaminants in a difficult-to-reach area, explain to the customer before any welding takes place the problems that may occur in the weld.
Step 3: Preheating (micro-TIG). Depending on the size of the mold and the degree of damage, if it is made of steel and is to be micro-TIG welded, it should first be preheated. Preheating permits the use of lower amperage, which produces a smaller weld and helps reduce cracking. The preheating can take place on an electric hotplate, with a torch (for larger molds) or in a specialty oven. The preheat temperature parameters vary for each steel type, so follow the steel manufacturer’s guidelines. Typically, mold steels require a temperature range from 500°F to 700°F. A color change to brown or purple in most steels indicates proper heating. This is not true for 420 stainless steel, however, which will show no noticeable color change due to its high level of chromium. Chromium provides heat resistance and so requires the use of an infrared temperature gun or a temperature-indicating crayon to ensure the proper heating temperature is reached.
The microscopic heat-affected zone created by laser welding eliminates the need for preheating in those applications, although the material being laser-welded should be at least at room temperature. This reduces microscopic cracking in materials with a Rockwell hardness higher than 55.
Step 4: Filler choice. Check with your rod supplier to accurately match your filler rod to the steel to be welded, and be aware that the required diameter of filler rod may not always be available.
When selecting a filler rod, consider mold steel type, type of repair and expectations of the engineer/customer. For example, if the customer requires a weld with a lower Rockwell hardness for 420 stainless steel, use 420 or 410 stainless filler rod. The same applies with H-13 steel, in which case you should use H-13 or an H-13-modified filler rod (softer Rockwell hardness). Ultimately, the customer dictates the use of standard or modified filler rod, and the Rockwell hardness of a filler rod is a key factor. Generally, the lower hardness of softer filler rods provides crack resistance, and harder filler rods provide wear resistance and durability. A softer, modified filler rod may be used on repairs in inside corners, for example, because a hard filler rod can cause cracking in the center of the weld bead.
Step 5: Welding. Each welding process requires a specific technique, position and machine calibration. This is where welding experience and the machine manufacturer’s guidelines come into play. A seasoned welder knows how to accurately calibrate the starting micro-TIG amperage, laser beam power and displacement, and shielding gas displacement. He or she also knows that, with laser welding, positioning the laser beam to the correct distance and angle is critical to ensure the best penetration. Experience also shows that micro-TIG welding requires a special feeding technique when adding filler rods in diameters smaller than 0.015 inch, because rods of this size melt before entering the weld puddle. Lastly, an expert welder knows that preheated molds need to maintain the preheat temperature throughout the welding process to reduce the potential for cracking and improve the general weld-ability of the material.
Step 6: Postheating (micro-TIG). After welding, the mold should be postheated or stress-relieved, as this reduces hardness and other stresses in the heat-affected zone of the weld. Postheating is similar to preheating, except the temperature range is much higher (1,100°F to 1,250°F). It is important not to postheat the steel near the annealing point (1,350°F to 1,750°F), since this will lower steel hardness and cause changes in the dimension of the material. Using a tool to accurately test mold temperature during postheat is necessary. As with preheating, laser welding does not require postheating.
Step 7: Customer inspection. After postheating, the mold needs to cool down slowly to room temperature. Forced rapid cooling (using water or refrigeration) can shock the steel, causing cracks. Once the piece is cool enough to handle, clean it with isopropyl alcohol and a stainless steel brush, and return it to the customer. Upon delivery, the customer should inspect the weld
repair using a magnifying glass.
These seven steps serve as guidelines for a mold’s weld preparation and welding process. Exceptions can be made based on customer requests and parameters.
Steps of Injection Mold Repair
(1) When the mold is being disassembled, relocate it smoothly and avoid collision or water;
(2) Heat the mold and apply a small amount of release agent to it;
(3) Fully inspect the mold and make anti-rust treatment. Carefully wipe dry and wipe clean the cavity, core, ejection structure and slides, and apply anti-rust agents and machine oil to the mold.
Two Classes of Injection Mold Maintenance
In the continuous working process, the mold needs to be maintained due to the part wearing, deterioration of the lubricant, water leakage, and crushing of the plastic material during the movement,Mold maintenance usually includes daily maintenance and off-machine maintenance.
(1) The daily maintenance of molds includes the following aspects:
Remove rust regularly (surface, PL planes, cavity and core)
Lubricate regularly (ejection structure and slides)
Replace wearing parts regularly (pull rods and bolts)
(2) In off-machine maintenance of the mold, professional maintainers will disassemble the mold and test and maintain its cavity and ejection pin professionally.
Due to the specificity, precision, and fragility of the injection mold, it is very important to protect the safety of the mold.
(1) Avoid rusting
Protect the injection mold from rusting due to water leakage, water condensation, rain and hand marks.
(2) Avoid collision
Protect the mold from collisions due to fracture or inadequate restoration of the ejection pin.
(3) Burr removal
Remove burrs on the mold due to cloth wiping, feeding pressing, hand wiping, plastic nipper contact and knife contact.
(4) Missing parts
Protect the mold from being damaged during use due to missing pull rods, gaskets and other parts.
(5) Avoid compression
Protect the mold from compressing damage due to clamping resulted from product residues.
(6) Avoid voltage shortage
Protect the mold from being damaged due to excessive pressure for low-voltage protection.